Menu Close

CSO 052 Regulator Modification

Status: Ongoing
GI Technology: Sewer Hydraulic Improvement
Project Year: 2021

$210,700

*TOTAL cost

TBD

**TOTAL CAPTURE: GAL/YR

Project Description:

The CSO 052 Regulator Modification project demonstrates the County’s proactive approach for Combined Sewer Overflow (CSO) reduction and maintenance improvements. The existing configuration of the CSO 052 regulator structure and regulator pipe connection to the County’s main interceptor sewer is poor hydraulically resulting in undesirable solids settlement creating a frequent maintenance burden for the County. The goals of the CSO 052 Regulator Modification project are to 1) improve flow hydraulics into the main interceptor sewer and ease the maintenance burden by reducing solids from capturing in the regulator structure; and 2) upsize the regulator pipe to the main interceptor sewer to increase conveyance of flows to Metro for treatment.

Download project details below:

Project Description

Share This Project