Geddes Street Road Reconstruction

The Geddes Street Road Reconstruction Project was coordinated with needed public roadway improvements along South Geddes Street, which borders the George Fowler High School parking lot and sports fields in addition to other parcels.

This project featured the design and installation of vegetated curb extensions adjacent to the sidewalk on the western side of the 300-500 blocks of South Geddes Street. Vegetated curb extensions with subsurface infiltration trenches capture and infiltrate stormwater runoff from the right of way, preventing approximately 523,000 gallons per year from entering the combined sewer system.

 

Download project details below:

Geddes Street

Project Plans
Geddes Street Project Completion Report (PDF) Project Completion Report (PDF)

Previous post:

Next Project:

Project Details

$278,196
Total Amount
Cost
515,000
Gallons Per Year
Capture