Village of Solvay, Youth Center

 Solvay Youth Center before green infrastructure installation

The Village of Solvay is installing a bioretention system along the base of a hill behind the Solvay Youth Center. The bioretention installation will be approximately 500 feet long, with a width of 9 feet to capture runoff from approximately 2.87 acres.

This bioretention system is designed to capture approximately 968,200 gallons per year.

 Download project details below:

Solvay Youth Center SGIP Fact Sheet (PDF)

Project Overview

Solvay Youth Center SGIP Application (PDF)

Solvay SGIP Application

 

Previous post:

Next Project:

Project Details

$62,394
Total Amount
Cost
968,200
Gallons Per Year
Capture