West Fayette Street Sewer Separation

W Fayette Project Area Map

The West Fayette Street Sewer Separation project between Onondaga Creek and South Salina Street included the installation of a new 24” separate storm sewer in Fayette Street that captures the runoff from the street via existing and new street catch basins. The project also included the connection to existing storm sewers on South Clinton and South Franklin Streets that capture additional stormwater from those streets.

This project was completed in conjunction with the upcoming Phase 2 and 3 Connective Corridor streetscape improvements by Syracuse University and the City of Syracuse. This project was completed in advance of the start of construction of the next phases of the Connective Corridor project.


West Fayette After Construction 2013

Download project details below:

W Fayette Fact Sheet

Project Overview (PDF)

W Fayette Street - Connective Corridor - Project Plans (PDF)

Project Plans (PDF)

 

 

Previous post:

Next Project:

Project Details

$446,269
Total Amount
Cost
7,858,600
Gallons Per Year
Capture