GIF – Park Central Presbyterian Church

Status: Completed
GI Technology: Bioswale
Project Year: Archived

$61,050

*TOTAL cost

145,300

**TOTAL CAPTURE: GAL/YR

GIF - Park Central Presbyterian ChurchProject Description:

This Green Improvement Fund (GIF) project involved the replacement of the asphalt parking lot at Park Central Presbyterian Church. Conditions at the site allowed for the use of porous pavement to capture stormwater. The project also featured enhanced landscaping with tree plantings throughout the site. The new design provides 28 parking spaces for the church community and captures approximately 145,300 gallons of stormwater runoff annually.

The Park Central Presbyterian Church is located at 509 East Fayette Street. Founded in 1846, the church has been a pillar of the downtown community for 166 years and works closely with several organizations to provide services for local residents.

Download project details below:

GIF - Park Central Presbyterian Fact Sheet