Menu Close

Walton Street – CSO 029 Sewer Improvements

Status: Ongoing
GI Technology: Sewer Hydraulic Improvement
Project Year: 2021

$1,600,000

*TOTAL cost

3,300,000

**TOTAL CAPTURE: GAL/YR

Project Description:

Onondaga County will be improving sewer systems in the City of Syracuse with upgrades to the combined sewer system at the Walton Street Bridge. These improvements will reduce combined sewer overflow into nearby waters by increasing capacity of our combined sewer systems. The outcome of this project will be improved quality of life and water quality in Onondaga Creek and Onondaga Lake due to fewer combined sewer overflow events. Physical improvements from the work will include installation of a new regulator structure, raising and widening the weir within the regulator structure, replacing the adjacent manhole and piping, and installation of new ADA ramp and sidewalks.

For additional details, please click the following image to view a recording of our most recent public information meeting, or download a PDF of the presentation below.

Download project details below:

Project Overview
Community Meeting

Share This Project