The concrete base for the 4.9 million gallon Lower Harbor Brook CSO Storage Facility was poured on August 5, 2013. This 1,800 cubic-yard concrete placement was among the largest locally and across the United States to be completed without an onsite concrete batch plant. 3 concrete plants, 40 concrete trucks, and 3 concrete pumps came together for a very successful concrete pour!