South Clinton Street – Road Reconstruction

Status: Completed
GI Technology: Bioswale
Project Year: 2013

221000

*TOTAL cost

893000

**TOTAL CAPTURE: GAL/YR

Road Reconstruction - Underground Infiltration TrenchProject Description:

The S. Clinton Street Road Reconstruction Project exemplifies the continued partnership between the City of Syracuse and Onondaga County through the Save the Rain Program. The City of Syracuse had planned to reconstruct S. Clinton Street in 2013, and Onondaga County partnered with the City to construct an underground infiltration trench system at the time of the road reconstruction. This project was constructed by the City’s contractor under their annual Street Structures contract, providing further cost savings for both the City and the County.

A four foot deep underground infiltration trench spanning the length of Clinton Street between W. Adams and Temple Streets was constructed in the summer of 2013. The trench is eight feet wide, utilizing as much storage space as possible without disrupting existing underground utilities. Being completely underground, the infiltration trench system provides a very high capture volume without requiring any obtrusive footprint at the surface. This project captures a total of 893,000 gallons of stormwater annually and was completed in 2013.

Download project details below:

S Clinton Street Road Recon Fact Sheet (PDF)
Project Overview (PDF)
Road Reconstruction Project Plans
Project Plans (PDF)

Share This Project