Village of Solvay – Highway Garage Bioretention

Status: Completed
GI Technology: Bioswale
Project Year: 2021

110000

*TOTAL cost

508000

**TOTAL CAPTURE: GAL/YR

 

2013 Solvay Hwy Garage - BEFORE

Project Description:

The Village of Solvay proposes a bioretention project at their highway garage facility. The site contains poorly draining soils, so the proposed bioretention basin will be equipped with an underdrain system to improve drainage and promote pollutant removal through filtration.  Some grading will also be required to create bioswales to direct runoff to the basin and modification to the existing retaining wall along the east side of the highway garage to allow for drainage.

2013 SGIP Fact Sheet – Solvay Hwy Garage