![Solvay Youth Center BEFORE Solvay Youth Center before green infrastructure installation](https://xnp104.p3cdn1.secureserver.net/wp-content/uploads/2012/05/Solvay-Youth-Center-BEFORE-300x215.jpg)
The Village of Solvay is installing a bioretention system along the base of a hill behind the Solvay Youth Center. The bioretention installation will be approximately 500 feet long, with a width of 9 feet to capture runoff from approximately 2.87 acres.
This bioretention system is designed to capture approximately 968,200 gallons per year.